Do you have any question about this error?
Message type: E = Error
Message class: C5 - Master Recipe
Message number: 453
Message text: At least 2 phases must exist
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
C5453
- At least 2 phases must exist ?The SAP error message C5453 ("At least 2 phases must exist") typically occurs in the context of project management or production planning when dealing with phases in a project or process. This error indicates that the system expects at least two phases to be defined for a particular operation, but it has found fewer than that.
Cause:
- Insufficient Phases Defined: The most common cause of this error is that the user has defined only one phase for a project or process where at least two are required.
- Configuration Issues: There may be a configuration issue in the project or process settings that does not allow for the proper definition of phases.
- Data Entry Errors: Users may have inadvertently entered data incorrectly, leading to the system not recognizing the phases correctly.
Solution:
- Check Phase Definitions: Go to the relevant project or process definition and ensure that at least two phases are defined. You can do this by navigating to the project or process management area in SAP and reviewing the phase settings.
- Add Missing Phases: If you find that only one phase is defined, add the necessary additional phase(s) to meet the requirement.
- Review Configuration Settings: If you are unsure how to add phases or if the option is not available, check the configuration settings for the project or process type. You may need to consult with your SAP administrator or a functional consultant to ensure that the system is set up correctly.
- Consult Documentation: Refer to SAP documentation or help resources for specific instructions on how to manage phases in your particular module (e.g., Project System, Production Planning).
- Testing: After making changes, test the process again to ensure that the error is resolved.
Related Information:
If the issue persists after following these steps, it may be beneficial to reach out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
C5452
You cannot maintain relationships between different recipes of one group
What causes this issue? The phase you entered belongs to a different recipe of the same recipe group. However, you cannot maintain relationships betw...
C5451
You can only maintain relationships between phases
What causes this issue? You want to maintain operations with relationships. This is not necessary in the master recipe and is prevented by the syste...
C5454
Unable to create relationships
What causes this issue? The system tried to create <DS:GLOS.3526C528AFAB52B9E10000009B38F974>relationships</>. It failed, however, since ...
C5455
Relationships were generated successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.