Message type: E = Error
Message class: C2 - Other messages production orders
Message number: 527
Message text: Network already linked to another Major Assembly
The Network already contain installation kits from another Major
Assembly. Exploding Major assemblies, other than what are linked with
network in table MPE_BOM_PS_REL will cause inconsistency in Project.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
C2527
- Network already linked to another Major Assembly ?The SAP error message C2527, "Network already linked to another Major Assembly," typically occurs in the context of project management or production planning within SAP, particularly when dealing with networks in the Project System (PS) or Production Planning (PP) modules. This error indicates that the network you are trying to link to a major assembly is already associated with another major assembly, which is not allowed.
Cause:
- Network Assignment: The network you are trying to assign is already linked to a different major assembly. In SAP, a network can only be linked to one major assembly at a time.
- Project Structure: The project structure may not be set up correctly, leading to conflicts in network assignments.
- Data Integrity Issues: There may be inconsistencies in the data or configuration that prevent the network from being linked to the desired major assembly.
Solution:
- Check Existing Links: Review the existing assignments of the network to see which major assembly it is currently linked to. You can do this by navigating to the network in question and checking its details.
- Reassign the Network: If the network needs to be linked to a different major assembly, you may need to unlink it from the current major assembly first. This can typically be done in the network's detail view.
- Create a New Network: If the existing network is required for another major assembly and cannot be unlinked, consider creating a new network specifically for the new major assembly.
- Consult Documentation: Refer to SAP documentation or your organization's guidelines for managing networks and major assemblies to ensure compliance with best practices.
- Check Authorizations: Ensure that you have the necessary authorizations to make changes to network assignments.
Related Information:
CN21
(Create Network), CN22
(Change Network), and CN23
(Display Network) to manage networks effectively.By following these steps, you should be able to resolve the C2527 error and manage your networks and major assemblies effectively within SAP.
Get instant SAP help. Start your 7-day free trial now.
C2526
BOM is not released for &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C2525
Component is not assigned to network
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
C3001
Costing variant & does not exist
What causes this issue? You have entered costing variant &V1&. This costing variant does not exist.How to fix this error? Check your entry. ...
C3002
Costing variant & does not belong to material cost estimate
What causes this issue? You are attempting to check costing variant &v1&. However, this costing variant is not valid for material costing.Sys...
Click on this link to search all SAP messages.