Message type: E = Error
Message class: C2 - Other messages production orders
Message number: 119
Message text: No check exists for planning (item: &1, mat.: &2)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message C2119 "No check exists for planning (item: &1, mat.: &2)" typically occurs in the context of Material Requirements Planning (MRP) or when working with planning scenarios in SAP. This error indicates that there is no defined check or validation for the specified item and material combination in the planning process.
Cause: Missing Configuration: The error often arises when there is no planning strategy or check defined for the specific material (mat.: &2) and item (item: &1) in the system. Material Master Data: The material master data may not be properly set up, particularly in the MRP views. Planning Parameters: The planning parameters for the material might not be correctly defined, leading to the absence of checks during the planning run. Item Category: The item category used may not be compatible with the planning process, or it may not have been configured to allow planning checks.
Solution: Check Material Master Data: Go to the material
Get instant SAP help. Sign up for our Free Essentials Plan.
C2118 Item &1 material &2: manually confirmed quantity was cancelled
What causes this issue? The confirmed quantity of the item has been changed manually in <GL:backorder_processing>backorder processing</>....
C2117 All selected reservations are locked by another user
What causes this issue? All the reservations for the components selected are locked by another user.System Response Only those material components c...
C2120 Order & was confirmed
What causes this issue? Operations were already confirmed for the current order. This is why the routing cannot be read in again.System Response The...
C2121 Order & is partially confirmed
What causes this issue? Operations have already been partially confirmed for the current order. This is why the routing cannot be read in again.Syste...
Click on this link to search all SAP messages.