Do you have any question about this error?
Message type: E = Error
Message class: BP - Budgeting and planning
Message number: 318
Message text: Field overflow in control total verification
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
BP318
- Field overflow in control total verification ?The SAP error message BP318, which states "Field overflow in control total verification," typically occurs during the processing of business partner (BP) data, particularly when there is a mismatch or an overflow in the data being processed. This error is often related to the control totals that are used to verify the integrity of data during transactions.
Cause:
- Data Overflow: The error usually indicates that the data being processed exceeds the defined limits for a particular field. This can happen if the values being entered or calculated exceed the maximum size allowed for that field.
- Incorrect Data Entry: If the user inputs a value that is too large for the designated field, it can trigger this error.
- Configuration Issues: Sometimes, the configuration settings for the business partner data may not align with the data being processed, leading to discrepancies.
- Data Type Mismatch: If there is a mismatch between the expected data type and the actual data being processed, it can lead to overflow errors.
Solution:
- Check Input Values: Review the values being entered into the system. Ensure that they are within the acceptable range for the fields in question.
- Field Length Verification: Verify the field lengths in the database or configuration settings. Ensure that the data being processed does not exceed these lengths.
- Data Validation: Implement data validation checks before processing to catch any potential overflow issues early.
- Review Configuration: Check the configuration settings for the business partner data to ensure they are set up correctly and are compatible with the data being processed.
- Debugging: If the issue persists, consider using debugging tools within SAP to trace the exact point of failure and identify the specific data causing the overflow.
- Consult Documentation: Refer to SAP documentation or support for any specific notes or patches related to this error message.
Related Information:
BP
for business partner management.If the problem continues after trying the above solutions, it may be beneficial to reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
BP317
Please enter a document line item
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
BP316
Balance in payment budget is not zero (balance: &)
What causes this issue? The balance in the payment budget for the sender and receiver is not zero. Balance: &V1&.System Response The system...
BP319
Item total is not the same as the control total in the commitment budget
What causes this issue? The system has calculated a commitment budget total for the items entered which does not agree with the control total you hav...
BP320
Item total is not the same as the control total in the payment budget
What causes this issue? The system has calculated a payment budget total for the items entered which does not agree with the control total you have s...
Click on this link to search all SAP messages.