How To Fix BCOM_R059 - Validity period (parameter VALID_FROM / VALID_UNTIL): From &1 to &2


BCOM_R059 - Overview

  • Message type: E = Error

  • Message class: BCOM_R - Business Communication: Messages for Rule-Based Routing

  • Message number: 059

  • Message text: Validity period (parameter VALID_FROM / VALID_UNTIL): From &1 to &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message BCOM_R059 - Validity period (parameter VALID_FROM / VALID_UNTIL): From &1 to &2 ?
    The SAP error message BCOM_R059 indicates an issue with the validity period of a certain parameter, specifically the VALID_FROM and VALID_UNTIL dates. This error typically arises in the context of business partner or master data management, where the system expects a valid date range for certain entries.
    
    Cause: The error occurs when: The VALID_FROM date is later than the VALID_UNTIL date, which creates an invalid date range. The dates provided do not align with the expected business logic or configuration settings in the system. There may be missing or incorrectly configured entries in the master data that relate to the validity period.
    Solution: To resolve the BCOM_R059 error, you can take the following steps: Check the Dates: Review the VALID_FROM and VALID_UNTIL dates in the relevant transaction or master data record. Ensure that: VALID_FROM is earlier than or equal to VALID_UNTIL. Both dates are correctly formatted and valid. Adjust the Validity Period: If the dates are incorrect, update them to reflect

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author