Do you have any question about this error?
Message type: E = Error
Message class: AJ - Billing program
Message number: 175
Message text: Portion &1 was simulated successfully
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
AJ175
- Portion &1 was simulated successfully ?The SAP error message AJ175, which states "Portion &1 was simulated successfully," typically indicates that a simulation of a portion (such as a production order, cost estimate, or similar) has been completed without any issues. However, it is important to note that this message is not an error in the traditional sense; rather, it is an informational message indicating that the simulation process was successful.
Cause:
Since AJ175 is an informational message indicating success, there is typically no action required to resolve an error. However, if you are expecting a different outcome or if you are looking for further actions, consider the following steps:
Review Simulation Results: Check the details of the simulation to ensure that the results align with your expectations. This may involve reviewing the logs or output generated by the simulation process.
Proceed with Next Steps: If the simulation was successful and the results are satisfactory, you can proceed with the next steps in your process, such as executing the actual transaction or making changes based on the simulation results.
Consult Documentation: If you need more context about the simulation process or the specific portion being referenced, consult the relevant SAP documentation or help resources.
Check for Additional Messages: Sometimes, other messages may accompany AJ175 that provide further context or information. Make sure to review any additional messages that may have been generated during the simulation.
In summary, the AJ175 message indicates a successful simulation, and you can proceed with your process based on the results obtained. If you have specific concerns or need further assistance, consider reaching out to your SAP support team or consulting relevant documentation.
Get instant SAP help. Start your 7-day free trial now.
AJ174
Deletion operand &3 in schema &1 is inconsistent
What causes this issue? Schema &v1& contains <DS:DE.DELOPERAND>deletion operand</> &v3& in step &v2&. This deleti...
AJ173
Deletion variant with inconsistent time slice
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
AJ176
Portion &1 was billed successfully
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AJ177
Simulation of portion &1 was terminated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.