Message type: E = Error
Message class: AH - IS-U billing (master data)
Message number: 185
Message text: To-nominal load is zero
The to-nominal load may never have a value of zero
Check your entry
Error message extract from SAP system. Copyright SAP SE.
AH185
- To-nominal load is zero ?The SAP error message AH185, which states "To-nominal load is zero," typically occurs in the context of SAP's Advanced Planning and Optimization (APO) or similar modules where load planning and capacity management are involved. This error indicates that the system is trying to process a load or capacity requirement, but the nominal load value is zero, which is not valid for the operation being performed.
Causes:
- Incorrect Master Data: The master data for the resource or production process may not be set up correctly, leading to a nominal load of zero.
- Planning Parameters: The planning parameters for the product or resource may not be defined properly, resulting in no load being calculated.
- Capacity Constraints: There may be constraints or settings in the capacity planning that lead to a situation where no load is assigned.
- Data Entry Errors: Manual entries in the planning or production orders may have been incorrectly set to zero.
Solutions:
- Check Master Data: Review the master data for the relevant resources, products, and production processes. Ensure that the nominal load values are correctly defined.
- Review Planning Parameters: Verify the planning parameters and settings for the product or resource. Make sure that they are set up to allow for load calculations.
- Adjust Capacity Settings: Look into the capacity planning settings to ensure that they are configured correctly and that there are no constraints preventing load assignment.
- Data Validation: Check for any manual entries in the planning or production orders that may have inadvertently set the load to zero. Correct any errors found.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error and its context within your SAP environment.
Related Information:
/SAPAPO/MC90
(for checking planning results) or /SAPAPO/SCM1
(for checking the supply chain) to investigate further.By following these steps, you should be able to identify the root cause of the AH185 error and implement the necessary corrections to resolve it.
Get instant SAP help. Start your 7-day free trial now.
AH184
From-nominal load is zero
What causes this issue? The from-nominal load should only be zero in the first block.System Response How to fix this error? Check the entry.Error me...
AH183
No entry found for object &2 in table &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
AH186
From-measured pressure is zero
What causes this issue? Only the first block can start with the value of zero.System Response How to fix this error? Check your entryError message e...
AH187
To-measured pressure is zero
What causes this issue? The to-measured pressure may never have a value of zeroSystem Response How to fix this error? Check your entryError message ...
Click on this link to search all SAP messages.