Do you have any question about this error?
Message type: E = Error
Message class: ACEDS - Accrual Engine: Distribution Server
Message number: 024
Message text: Key date &1 must be the day after the premature finish date &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
ACEDS024
- Key date &1 must be the day after the premature finish date &2 ?The SAP error message ACEDS024 indicates that there is a date inconsistency in the system related to asset accounting. Specifically, it states that the key date you are trying to use must be the day after the premature finish date. This typically occurs in the context of asset retirement or decommissioning processes.
Cause:
The error arises when you attempt to perform an action (like posting an asset retirement or adjustment) on a key date that is not valid according to the asset's lifecycle. The key date must be set to a date that is immediately after the premature finish date of the asset. If the key date is the same as or before the premature finish date, the system will throw this error.
Solution:
To resolve this error, you should:
Check the Premature Finish Date: Review the asset's details to confirm the premature finish date. This can be done in the asset master record.
Adjust the Key Date: Ensure that the key date you are trying to use is set to the day after the premature finish date. For example, if the premature finish date is January 10, 2023, the key date should be set to January 11, 2023, or later.
Re-evaluate the Transaction: If you are performing a transaction that involves multiple assets or dates, ensure that all relevant dates are consistent and valid.
Consult Documentation: If you are unsure about the asset's lifecycle or the implications of changing dates, refer to SAP documentation or consult with your SAP support team.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP Notes for any specific patches or updates related to this error message.
Get instant SAP help. Start your 7-day free trial now.
ACEDS023
The accrual object to be copied does not have the status "Completed"
trados = docu -> fi -> figlWhat causes this issue? You want to create a subsequent object to the following object in the Accrual Engine: Inter...
ACEDS022
New quantity unit &1 not equal to &2 for accrual type/AP = &3/&4
trados = docu -> fi -> figlWhat causes this issue? When copying the accrual object, the amounts to be accrued in the new object should be matc...
ACEDS025
Messages during the calculation of accrual values:
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
ACEDS026
Accrual item for &1 / &2 / &3 / &4 not found
What causes this issue? The following accrual subobject could not be found in the Accrual Engine for the corresponding period or date: External refer...
Click on this link to search all SAP messages.