Do you have any question about this error?
Message type: E = Error
Message class: 7A - PS Progress Analysis
Message number: 055
Message text: Measurement method & is not allowed for WBS elements
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
7A055
- Measurement method & is not allowed for WBS elements ?The SAP error message 7A055 indicates that a specific measurement method is not allowed for Work Breakdown Structure (WBS) elements. This error typically arises in the context of project management and cost accounting within SAP, particularly when dealing with project-related transactions.
Cause:
The error can occur due to several reasons:
- Incorrect Measurement Method: The measurement method assigned to the WBS element is not compatible with the type of transaction you are trying to perform. For example, certain measurement methods may only be applicable to specific types of cost elements or project structures.
- Configuration Issues: The configuration settings in the SAP system may not allow the specified measurement method for the WBS element. This could be due to settings in the project profile or the controlling area.
- WBS Element Status: The status of the WBS element may restrict certain types of transactions or measurement methods. For instance, if the WBS element is locked or in a status that does not allow certain activities, this error may occur.
Solution:
To resolve the error, consider the following steps:
- Check Measurement Method: Verify the measurement method assigned to the WBS element. Ensure that it is appropriate for the type of transaction you are attempting.
- Review WBS Element Configuration: Check the configuration settings for the WBS element in the project profile. Ensure that the measurement method is allowed for the specific WBS element.
- Change WBS Element Status: If the WBS element is in a status that restricts the transaction, consider changing its status to allow the desired operation.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on allowed measurement methods for WBS elements.
- Contact SAP Support: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert to investigate further.
Related Information:
By following these steps, you should be able to identify the cause of the error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
7A054
Measurement method & is not allowed for orders
What causes this issue? You have selected measurement method &V1&. This method is not supported for orders.System Response INCLUDE 'NA_...
7A053
Actual = Plan can only be used for actual percentage of completion
What causes this issue? You have selected measurement method &V1&. In this method, the system copies the planned POC to the actual POC. You c...
7A056
Measurement method & is not allowed in planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
7A057
Progress version can only be used with measurement method &2
What causes this issue? Progress version &V1& takes the budget as the basis for the BCWP. If you choose the budget as the basis, you cannot w...
Click on this link to search all SAP messages.