How To Fix 6P614 - Schedule line & has already been transferred


6P614 - Overview

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 614

  • Message text: Schedule line & has already been transferred

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6P614 - Schedule line & has already been transferred ?
    The SAP error message "6P614 Schedule line & has already been transferred" typically occurs in the context of sales and distribution (SD) or materials management (MM) when there is an attempt to process a schedule line that has already been transferred to another system or has already been processed in the current system.
    
    Cause: Duplicate Processing: The schedule line may have already been processed or transferred in a previous transaction, leading to an attempt to process it again. Integration Issues: If you are using an integrated system (like SAP with another ERP or a third-party system), the schedule line may have been transferred to that system, and the current system is not aware of this. Data Consistency: There may be inconsistencies in the data, such as a lack of synchronization between systems or incorrect status updates.
    Solution: Check Schedule Line Status: Verify the status of the schedule line in the system. You can do this by

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant