Do you have any question about this error?
Message type: E = Error
Message class: 6P - Messages for planned independent requirements (Appl.area 60)
Message number: 107
Message text: Strategy group & requires an exact lot size
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
6P107
- Strategy group & requires an exact lot size ?The SAP error message 6P107 indicates that a strategy group requires an exact lot size for production or procurement. This typically occurs in the context of production planning and control, particularly when using certain planning strategies that necessitate specific lot sizes for manufacturing or purchasing materials.
Cause:
The error arises when:
- Strategy Group Configuration: The strategy group assigned to the material in the material master is configured to require an exact lot size. This means that the system expects the production or procurement quantity to match a predefined lot size exactly.
- Lot Size Settings: The lot size settings in the material master or the production version may not align with the requirements of the strategy group.
- Planning Parameters: The planning parameters set in the system may not be compatible with the requirements of the strategy group.
Solution:
To resolve the error, you can take the following steps:
Check Material Master Data:
- Go to the material master (transaction code
MM03
) and check the relevant views (especially the MRP and Work Scheduling views).- Verify the lot size settings and ensure they are correctly defined according to the requirements of the strategy group.
Review Strategy Group Settings:
- Check the configuration of the strategy group in the customizing settings (transaction code
SPRO
).- Ensure that the strategy group is set up correctly and that it aligns with the intended lot size requirements.
Adjust Lot Size:
- If necessary, adjust the lot size in the material master to match the exact lot size required by the strategy group.
- You can also consider changing the strategy group if the current one does not fit your production or procurement needs.
Check Production Version:
- If applicable, check the production version for the material to ensure that it is correctly defined and that the lot size matches the requirements.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for specific guidance related to your configuration and business processes.
Related Information:
MD04
(Stock/Requirements List), MD01
(MRP Run), and CO01
(Create Production Order) for further analysis and troubleshooting.By following these steps, you should be able to identify the root cause of the error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
6P106
Active indicator & is invalid.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P105
No data can be transferred after a change of period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P108
Strategy group & does not allow a rounding value
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P116
The forecast period could not be determined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.