How To Fix 6P079 - For the change number, schedule lines need to be maintained for & & & &


6P079 - Overview

  • Message type: E = Error

  • Message class: 6P - Messages for planned independent requirements (Appl.area 60)

  • Message number: 079

  • Message text: For the change number, schedule lines need to be maintained for & & & &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6P079 - For the change number, schedule lines need to be maintained for & & & & ?
    The SAP error message 6P079 typically indicates that there is an issue with the maintenance of schedule lines for a specific change number in the system. This error often arises in the context of production planning or materials management when trying to make changes to a production order or a related document.
    
    Cause: The error message "For the change number, schedule lines need to be maintained for & & & &" suggests that the system expects schedule lines to be defined for the specified change number, but they are either missing or not properly maintained. This can occur due to several reasons: Missing Schedule Lines: The schedule lines for the specified change number have not been created or are incomplete. Incorrect Configuration: The configuration settings for the material or the change number may not be set up correctly. Data Inconsistency: There may be inconsistencies in the data related to the change number, such as missing

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant