Message type: E = Error
Message class: 6P - Messages for planned independent requirements (Appl.area 60)
Message number: 045
Message text: Date is not within the planning horizon ( & - & )
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
6P045
- Date is not within the planning horizon ( & - & ) ?The SAP error message 6P045: Date is not within the planning horizon typically occurs in the context of planning and scheduling within SAP systems, particularly in modules like SAP APO (Advanced Planning and Optimization) or SAP S/4HANA.
Cause: This error indicates that the date you are trying to use for planning (e.g., a production date, delivery date, or any other date related to planning activities) falls outside the defined planning horizon. The planning horizon is a specific time frame set in the system that determines the period for which planning can be performed. If the date you are trying to use is before the start of the planning horizon or after its end, this error will be triggered.
Solution: To resolve this error, you can take the following steps: Check Planning Horizon Settings: Navigate to the relevant configuration settings in your SAP system where the planning horizon is defined. This can usually be found in the
Get instant SAP help. Sign up for our Free Essentials Plan.
6P044
Please enter an operator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P043
Please enter an MRP controller
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P046
Select a valid period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
6P047
Only inactive requirements exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.