Do you have any question about this error?
Message type: E = Error
Message class: 6A - Real estate messages rent adjustment
Message number: 551
Message text: Cost distribution acc.to apportionment unit; Constr.work values ignored
You want to carry out a rent adjustment as a result of a construction
measure. There are two ways of determining how the total costs of the
work are distributed between the participating rental units.
Indirectly via an apportionment factor (such as "living area")
Directly by detailing the costs on the rental units
In this particular case you have entered an apportionment unit as well
as maintaining the cost distribution in the master data of the
construction measure.
The system takes account of the apportionment unit and ignores the cost
distribution details for the construction measure.
If you want to carry out the cost distribution according to the data
entered for the construction measure, leave the "apportionment unit"
field empty.
Error message extract from SAP system. Copyright SAP SE.
6A551
- Cost distribution acc.to apportionment unit; Constr.work values ignored ?The SAP error message 6A551 indicates that there is an issue with cost distribution according to the apportionment unit in the context of construction work values. This error typically arises in the SAP system when there is a mismatch or inconsistency in the data related to cost distribution for construction projects.
Cause:
- Missing or Incorrect Apportionment Unit: The apportionment unit may not be defined correctly in the system, or it may be missing altogether.
- Inconsistent Data: There may be inconsistencies in the data related to the construction work values, such as incorrect assignment of costs or missing values.
- Configuration Issues: The configuration settings for cost distribution in the project system may not be set up correctly.
- Project Structure Issues: The project structure may not align with the expected configuration for cost distribution.
Solution:
- Check Apportionment Unit: Verify that the apportionment unit is correctly defined in the system. Ensure that it is assigned to the relevant project or cost object.
- Review Cost Assignment: Check the cost assignment for the construction work values. Ensure that all necessary values are entered and that they are consistent with the project structure.
- Configuration Review: Review the configuration settings for cost distribution in the project system. Ensure that all necessary settings are correctly configured.
- Data Consistency Check: Perform a data consistency check to identify any discrepancies in the project data. This may involve running reports or using transaction codes to analyze the data.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error message.
- Contact SAP Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
6A541
Record already reversed; selection cannot be reset
What causes this issue? You have already saved an (invidual) reversal date for the current rent adjustment record in the detail screen.System Respons...
6A540
No rental units assigned to expert opinion &
What causes this issue? You want to carry out a rent adjustment based on the expert opinion &V1& but have not assigned any rental units to it...
6A552
Enter apportionment unit or maintain actual cost distribution
What causes this issue? You want to make a rental adjustment due to a constructive measure. You have two options for specifying how the total costs c...
6A553
Actual cost distribution on construction measure incomplete
What causes this issue? You want to carry out a rent adjustment as a result of a construction measure. There are two ways of determining how the tota...
Click on this link to search all SAP messages.