How To Fix 6A029 - Surface unit of contract is & and not &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 6A - Real estate messages rent adjustment

  • Message number: 029

  • Message text: Surface unit of contract is & and not &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 6A029 - Surface unit of contract is & and not & ?

    The SAP error message 6A029 indicates that there is a mismatch between the surface unit of a contract and the expected surface unit. This error typically arises in the context of contract management or when dealing with materials and their associated units of measure in SAP.

    Cause:

    The error message "Surface unit of contract is & and not &" suggests that the system is expecting a specific unit of measure for a contract, but the actual unit of measure being used does not match this expectation. This can occur due to:

    1. Incorrect Configuration: The contract may have been set up with an incorrect unit of measure.
    2. Data Entry Errors: There may have been a mistake in entering the unit of measure when creating or modifying the contract.
    3. Master Data Issues: The material master or contract master data may not be aligned correctly, leading to discrepancies in expected units of measure.
    4. Inconsistent Units: Different parts of the system may be using different units of measure for the same material or contract.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Contract Details: Review the contract in question to ensure that the surface unit of measure is correctly defined. You can do this by navigating to the contract in SAP and checking the relevant fields.

    2. Verify Material Master Data: Ensure that the material master data associated with the contract has the correct unit of measure defined. You can check this in the material master record.

    3. Adjust Unit of Measure: If the contract is set up with the wrong unit of measure, you may need to change it to match the expected unit. This can usually be done in the contract management transaction.

    4. Consult Configuration Settings: If the issue persists, consult with your SAP configuration team to ensure that the units of measure are correctly configured in the system settings.

    5. Check for Updates or Notes: Sometimes, SAP releases notes or updates that address specific issues. Check the SAP Support Portal for any relevant notes related to this error message.

    6. Testing: After making any changes, perform tests to ensure that the error no longer occurs and that the contract functions as expected.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like ME33K (Display Contract) or ME32K (Change Contract) to view or modify contract details.
    • Unit of Measure Configuration: Familiarize yourself with the configuration settings for units of measure in SAP, which can be found in the customizing settings (SPRO).
    • SAP Notes: Search for SAP Notes related to error message 6A029 for any specific guidance or patches that may be available.

    If you continue to experience issues after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP contract management.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker