How To Fix 67442 - The planned records could not be regenerated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 67 - Loans Messages - Financial Assets Management

  • Message number: 442

  • Message text: The planned records could not be regenerated

  • Show details Hide details
  • What causes this issue?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Carry out a planned record update for this loan.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 67442 - The planned records could not be regenerated ?

    The SAP error message 67442, "The planned records could not be regenerated," typically occurs in the context of production planning and control, particularly when dealing with planned orders, production orders, or similar planning records. This error indicates that the system was unable to regenerate planned records due to certain issues.

    Causes:

    1. Missing Master Data: The required master data (like material master, BOM, routing, etc.) may be incomplete or missing.
    2. Incorrect Planning Parameters: The planning parameters set in the system may not be appropriate for the materials or production processes involved.
    3. Locked Records: The planned records might be locked by another user or process, preventing regeneration.
    4. Errors in the Planning Run: There may have been errors during the last planning run that need to be addressed.
    5. Configuration Issues: There could be configuration issues in the planning settings that prevent the regeneration of planned records.

    Solutions:

    1. Check Master Data: Ensure that all relevant master data (material master, BOM, routing) is complete and correctly maintained.
    2. Review Planning Parameters: Verify that the planning parameters are set correctly for the materials and production processes.
    3. Unlock Records: If records are locked, identify the user or process that has locked them and resolve the issue.
    4. Analyze Planning Run Logs: Check the logs of the last planning run for any errors or warnings that need to be addressed.
    5. Configuration Review: Review the configuration settings in the planning area to ensure they are set up correctly.
    6. Re-run Planning: After addressing the above issues, try to re-run the planning process to regenerate the planned records.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like MD01 (MRP Run), MD02 (Single-item, multi-level planning), or MD04 (Stock/Requirements List) to analyze and manage planning data.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Refer to SAP documentation for detailed information on MRP and planning processes, as well as troubleshooting steps.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant