Message text: Partner &1 cannot be used together with issue start &2
Partner &V1& cannot be used since it is not assigned a valid role as of
the issuer's start date entered in class master data &V2&. The role
defines the partner as the issuer.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Do one of the following:
Use a different partner with the valid role of <LS>Issuer</>
Assign the role <LS>Issuer</> to partner &V1&
Extend the validity of this role
INCLUDE 'CUSTOMIZED_MESSAGE_INFO' OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
65238
- Partner &1 cannot be used together with issue start &2 ?The SAP error message 65238, which states "Partner &1 cannot be used together with issue start &2," typically occurs in the context of partner functions and their associated validity periods in SAP systems, particularly in modules like Sales and Distribution (SD) or Materials Management (MM).
Cause:
This error usually arises when there is a conflict between the partner function (represented by &1) and the issue start date (represented by &2). The specific reasons for this error can include:
Invalid Partner Function: The partner function you are trying to use is not valid for the specified issue start date. This could be due to the partner's status or configuration.
Date Overlap: The issue start date may fall outside the valid date range for the partner function. For example, if the partner function is only valid for a specific period, and the issue start date does not fall within that range, the error will occur.
Configuration Issues: There may be configuration settings in the partner function setup that restrict the use of certain partners with specific issue dates.
Solution:
To resolve this error, you can take the following steps:
Check Partner Function Validity: Verify the validity of the partner function you are trying to use. Ensure that it is active and valid for the issue start date you are working with.
Review Date Settings: Look at the date settings for the partner function in the configuration. Ensure that the issue start date falls within the valid range for that partner.
Adjust Configuration: If necessary, adjust the configuration settings for the partner function to allow it to be used with the specified issue start date.
Consult Documentation: Refer to SAP documentation or help resources for specific details on the partner function and its configuration.
Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance.
Related Information:
BP
(Business Partner) or VOTXN
(for partner determination) to check and modify partner settings.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
65237
Cannot change interest calc. meth. affecting conditions with posted flows
What causes this issue? The interest calculation method was changed in the condition header. The interest calculation method from the condition heade...
65236
Cannot delete exchange because it is used by a position
What causes this issue? The valid-from date for the SPPI classification already exists.System Response The system issues an error message and will n...
65239
Partner &1 cannot be used together with end of term &2
What causes this issue? Partner &V1& cannot be used since it is not assigned a valid role as of the end of the term entered in class master d...
65240
Compound interest calc. not possible with single interest cond.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.