How To Fix 63440 - &1 for RU (&2) is after &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 63 - Messages for Real Estate Management

  • Message number: 440

  • Message text: &1 for RU (&2) is after &3

  • Show details Hide details
  • What causes this issue?

    You tried to carry out an adjustment based on index change or mortgage
    rate change. The current rent is based on the &v1& of &v2&. It is to be
    adjusted based on the &v1& of &v3&.

    System Response

    The system will not carry out an adjustment.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 63440 - &1 for RU (&2) is after &3 ?

    The SAP error message 63440 typically indicates a problem related to the scheduling of a resource utilization (RU) in a production planning or scheduling context. The message format you provided suggests that it is related to a specific resource utilization that is scheduled after a certain time, which may not be allowed based on the system's configuration or business rules.

    Cause:

    The error message "63440 &1 for RU (&2) is after &3" generally means that the resource utilization (RU) identified by &1 for a specific resource (&2) is scheduled to occur after a specified time (&3). This could be due to:

    1. Incorrect Scheduling: The scheduling of the resource utilization may not comply with the defined rules or constraints in the system.
    2. Configuration Issues: There may be configuration settings in the production planning module that restrict scheduling beyond a certain time.
    3. Data Entry Errors: There could be a mistake in the data entry for the scheduling of the resource utilization.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Scheduling Parameters: Review the scheduling parameters and constraints for the resource utilization. Ensure that the scheduled time is within the allowed limits.
    2. Adjust the Schedule: If the scheduled time is indeed after the allowed time, adjust the schedule to comply with the defined rules.
    3. Review Configuration Settings: Check the configuration settings in the production planning module to ensure that they are set correctly and allow for the desired scheduling.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific details on the error message and its implications.
    5. Contact Support: If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance.

    Related Information:

    • Transaction Codes: You may want to check relevant transaction codes such as CO02 (Change Production Order) or CM21 (Capacity Planning) to review the resource utilization and scheduling.
    • SAP Notes: Look for SAP Notes related to error message 63440 for any known issues or patches that may address the problem.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant