Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 863
Message text: Lead-time scheduling not possible for Long Term Planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61863
- Lead-time scheduling not possible for Long Term Planning ?The SAP error message 61863, "Lead-time scheduling not possible for Long Term Planning," typically occurs in the context of Long Term Planning (LTP) when the system is unable to calculate lead times for certain materials or production processes. This can happen for several reasons, and understanding the cause is essential for finding a solution.
Causes:
- Missing Master Data: The required master data for materials, such as routing, bill of materials (BOM), or production versions, may be incomplete or missing.
- Incorrect Configuration: The configuration settings for lead time scheduling in the planning parameters may not be set correctly.
- Invalid Time Period: The planning horizon may extend beyond the valid time frame for the materials or resources involved.
- Capacity Constraints: There may be capacity constraints that prevent the system from scheduling the required operations.
- Planning Strategy Issues: The planning strategy assigned to the material may not be compatible with lead-time scheduling.
Solutions:
- Check Master Data: Ensure that all necessary master data (BOM, routing, production versions) is complete and correctly maintained for the materials involved.
- Review Planning Parameters: Verify the planning parameters in the LTP settings to ensure they are configured correctly for lead-time scheduling.
- Adjust Planning Horizon: If the planning horizon is too long, consider adjusting it to fit within the valid time frame for the materials.
- Analyze Capacity: Check for any capacity constraints in the production resources and resolve any issues that may be preventing scheduling.
- Review Planning Strategy: Ensure that the planning strategy assigned to the material is appropriate for lead-time scheduling and make adjustments if necessary.
Related Information:
MD61
(Create LTP) or MD02
(MDP) to analyze and adjust planning data.By addressing the underlying causes and implementing the suggested solutions, you should be able to resolve the error message 61863 and successfully perform lead-time scheduling in Long Term Planning.
Get instant SAP help. Start your 7-day free trial now.
61862
Lead-time scheduling not possible for preliminary planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61861
Lead-time scheduling not possible for external procurement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61865
Deletion of scheduling margin key &1 plant &2 is not possible
What causes this issue? You would like to delete the scheduling margin key &V1& in plant &V2& in the quality system (Q system), but t...
61866
Scheduling margin key &1 plant &2 is used in &3 master data
What causes this issue? You would like to delete the scheduling margin key &V1& of plant &V2& in the quality system (Q system), but t...
Click on this link to search all SAP messages.