Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 862
Message text: Lead-time scheduling not possible for preliminary planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61862
- Lead-time scheduling not possible for preliminary planning ?The SAP error message 61862, "Lead-time scheduling not possible for preliminary planning," typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system is unable to perform lead-time scheduling for a particular operation or production order due to certain constraints or missing data.
Causes:
- Missing Master Data: The relevant master data (like material master, routing, or work center) may not be properly maintained or may be missing.
- Incorrect Planning Parameters: The planning parameters for the material or production order may not be set correctly, leading to scheduling issues.
- Capacity Constraints: There may be capacity constraints in the work center that prevent scheduling.
- Invalid Dates: The dates specified for the production order or planning run may be invalid or inconsistent.
- Preliminary Planning Settings: The settings for preliminary planning may not be configured correctly in the system.
Solutions:
- Check Master Data: Ensure that all relevant master data (material master, routing, work center) is correctly maintained and complete.
- Review Planning Parameters: Verify the planning parameters for the material and ensure they are set correctly.
- Analyze Capacity: Check the capacity of the work center to ensure it can handle the planned operations. Adjust capacity or scheduling as necessary.
- Validate Dates: Ensure that the dates for the production order or planning run are valid and logical.
- Adjust Preliminary Planning Settings: Review and adjust the settings for preliminary planning in the configuration to ensure they align with your business processes.
Related Information:
MD04
(Stock/Requirements List) or CO01
(Create Production Order) to analyze the situation further.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
61861
Lead-time scheduling not possible for external procurement
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61860
Data is incomplete; check your entries
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61863
Lead-time scheduling not possible for Long Term Planning
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61865
Deletion of scheduling margin key &1 plant &2 is not possible
What causes this issue? You would like to delete the scheduling margin key &V1& in plant &V2& in the quality system (Q system), but t...
Click on this link to search all SAP messages.