Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 762
Message text: Reqmts switched from individual to collective reqmts
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
61762
- Reqmts switched from individual to collective reqmts ?The SAP error message 61762, which states "Reqmts switched from individual to collective reqmts," typically occurs in the context of materials management and production planning. This message indicates that the system has switched the processing of requirements from individual requirements to collective requirements. Here’s a breakdown of the cause, potential solutions, and related information:
Cause:
- Requirement Type: The error often arises when the system detects that individual requirements (e.g., for specific production orders or sales orders) are being consolidated into collective requirements. This can happen due to settings in the material master or the planning strategy being used.
- Planning Parameters: The planning parameters set in the material master or the configuration of the MRP (Material Requirements Planning) may dictate that certain requirements should be processed collectively.
- MRP Group Settings: The MRP group settings may also influence how requirements are aggregated and processed.
Solution:
- Check Material Master Settings: Review the material master data for the affected material. Look at the MRP views to ensure that the settings for requirement types and planning strategies are appropriate for your needs.
- Review MRP Group Configuration: Check the MRP group settings to see if they are configured to switch from individual to collective requirements. Adjust the settings if necessary.
- Analyze MRP Run: If the error occurs during an MRP run, analyze the MRP run logs to understand why the system is consolidating requirements. Look for any specific settings or parameters that may be causing this behavior.
- Adjust Planning Strategies: If you are using a specific planning strategy (like Make-to-Stock or Make-to-Order), ensure that it aligns with your requirement processing needs. You may need to change the strategy or adjust the settings accordingly.
- Consult Documentation: Refer to SAP documentation or help resources for detailed information on requirement types and MRP settings. This can provide insights into how to configure the system to meet your requirements.
Related Information:
If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP MM (Materials Management) or PP (Production Planning) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
61761
Reqmts switched from collective to individual reqmts
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61760
Material & is already being processed in plant &
What causes this issue? The system issues an error message and will not allow you to continue with this transaction until the error is resolved. Syst...
61763
No coverage by the master plan for this date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61764
Order date lies after the confirmation date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.