Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 704
Message text: Pegged planned order for requirements &1 / &2 does not exist
Planned order &V3& is to be procured by direct production. The pegged
requirement is dependent requirement &V1&/&V2&. This dependent
requirement includes planned order &V4& as the pegged requirement, but
planned order &V4& could not be found.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the pegged requirement explosion level of planned order &V3&.
Error message extract from SAP system. Copyright SAP SE.
61704
- Pegged planned order for requirements &1 / &2 does not exist ?The SAP error message 61704 indicates that a pegged planned order for a specific requirement does not exist. This typically occurs in the context of production planning and material requirements planning (MRP) when the system is unable to find a planned order that is linked to a specific requirement.
Cause:
- Missing Pegged Planned Order: The planned order that should fulfill the requirement is either not created or has been deleted.
- Incorrect Configuration: There may be issues with the configuration of the MRP settings or the production planning process.
- Data Inconsistencies: There could be inconsistencies in the master data, such as material master records or BOM (Bill of Materials) settings.
- Timing Issues: The planned order may not have been generated yet due to timing issues in the MRP run.
- Incorrect Requirement Type: The requirement type may not be set up correctly to link to a planned order.
Solution:
- Check Planned Orders: Verify if the planned order exists for the specified requirement. You can do this by checking the planned orders in the system using transaction codes like MD04 (Stock/Requirements List) or COHV (Mass Processing of Production Orders).
- Run MRP: If the planned order does not exist, consider running the MRP again to generate the necessary planned orders. Use transaction code MD01 or MD02 for this purpose.
- Review Configuration: Check the configuration settings for MRP and production planning to ensure they are set up correctly. This includes checking the MRP type, lot size, and other relevant parameters.
- Check Master Data: Review the material master data and BOM to ensure that all necessary information is correctly maintained and that there are no discrepancies.
- Analyze Requirement Type: Ensure that the requirement type is correctly defined and that it is set up to link to planned orders appropriately.
- Consult Logs: Check the MRP logs for any errors or warnings that may provide additional context on why the planned order was not created.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and MRP processes.
Get instant SAP help. Start your 7-day free trial now.
61703
Pegged requirement for planned order &1 does not contain an order number
What causes this issue? Planned order &V1& is to be procured by direct production. The pegged requirement of the planned order is dependent r...
61702
Pegged requirement for planned order &1 does not contain an order number
What causes this issue? Planned order &V1& is to be procured by direct production/direct procurement. The pegged requirement for the planned ...
61707
Cannot edit or delete object - TBLP entries exist (relevant to A&D GPD)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61710
Planned order &1 cannot be deleted. Goods receipt quantity greater than 0
What causes this issue? When copying planned orders from long-term planning to MRP, the system deletes existing planned orders in MRP that lie in the...
Click on this link to search all SAP messages.