Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 702
Message text: Pegged requirement for planned order &1 does not contain an order number
Planned order &V1& is to be procured by direct production/direct
procurement. The pegged requirement for the planned order is dependent
requirement or reservation &V2&/&V3&. However, this dependent
requirement or reservation does not include a pegged order so that no
superior order could be determined for planned order &V1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the pegged requirement explosion level of planned order &V1&.
Error message extract from SAP system. Copyright SAP SE.
61702
- Pegged requirement for planned order &1 does not contain an order number ?The SAP error message "61702 Pegged requirement for planned order &1 does not contain an order number" typically occurs in the context of production planning and material requirements planning (MRP). This error indicates that there is a pegged requirement associated with a planned order that does not have a corresponding order number, which can lead to issues in the planning and execution of production processes.
Cause:
- Missing Order Number: The planned order referenced in the error message does not have a valid order number associated with it. This can happen if the planned order was created incorrectly or if there was an issue during the MRP run.
- Data Inconsistency: There may be inconsistencies in the master data or transaction data that prevent the system from linking the planned order to a valid order.
- Incorrect Configuration: The configuration settings in the MRP or production planning module may not be set up correctly, leading to issues in how requirements are pegged to orders.
Solution:
- Check Planned Order: Review the planned order referenced in the error message. Ensure that it has been created correctly and that all necessary data is filled in, including the order number.
- Re-run MRP: If the planned order is missing an order number due to a temporary issue, re-running the MRP process may resolve the problem by regenerating the planned orders and their associated requirements.
- Check Master Data: Verify that the material master data, BOM (Bill of Materials), and routing information are correctly set up. Any inconsistencies in these areas can lead to issues with pegging.
- Analyze Pegging Relationships: Use transaction codes like MD04 (Stock/Requirements List) to analyze the pegging relationships and see if there are any discrepancies that need to be addressed.
- Consult SAP Notes: Check the SAP Support Portal for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
Related Information:
If the problem persists after following these steps, it may be necessary to involve your SAP support team or a consultant with expertise in production planning and MRP processes.
Get instant SAP help. Start your 7-day free trial now.
61701
There is no pegged requirement for planned order &1
What causes this issue? Planned order &V1& is to be procured by direct production/direct procurement. The pegged requirement of the planned o...
61700
***** COMMENT: Pegged orders PlOrd: No direct calls -> LTP
What causes this issue? Comment: Messages 701-704 are used in the search for the leading order of a planned order in the case of direct production or...
61703
Pegged requirement for planned order &1 does not contain an order number
What causes this issue? Planned order &V1& is to be procured by direct production. The pegged requirement of the planned order is dependent r...
61704
Pegged planned order for requirements &1 / &2 does not exist
What causes this issue? Planned order &V3& is to be procured by direct production. The pegged requirement is dependent requirement &V1&am...
Click on this link to search all SAP messages.