Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 593
Message text: No scheduling allowed
According to the scheduling levels in Customizing, no scheduling is
allowed for this order/these orders.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The scheduling levels (detailed, prod.rate, rough-cut) are maintained
in Customizing in the MRP menu.
They depend on:
the order group (here: "planned order"),
the order type of the planned order as well as,
the production scheduler, that must be allocated in the material
master.
The indicator for scheduling must also be selected for the chosen
scheduling level.
Error message extract from SAP system. Copyright SAP SE.
61593
- No scheduling allowed ?The SAP error message "61593 No scheduling allowed" typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system has determined that scheduling cannot be performed for a particular operation or order due to certain constraints or settings.
Causes:
- Order Status: The order may be in a status that does not allow scheduling (e.g., completed, closed, or canceled).
- Scheduling Parameters: The scheduling parameters for the order or operation may not be set correctly, preventing the system from scheduling.
- Resource Availability: The resources (e.g., machines, labor) required for the operation may not be available or may be set to not allow scheduling.
- Capacity Constraints: There may be capacity constraints that prevent the scheduling of the operation.
- Planning Version: The planning version being used may not allow scheduling for the specific order or operation.
- Production Version: The production version assigned to the order may not be valid or may not allow scheduling.
Solutions:
- Check Order Status: Verify the status of the order. If it is not in a status that allows scheduling, you may need to change the status or create a new order.
- Review Scheduling Parameters: Check the scheduling parameters for the order or operation to ensure they are set correctly.
- Resource Availability: Ensure that the required resources are available and configured to allow scheduling.
- Capacity Planning: Review capacity planning settings to ensure that there are no constraints preventing scheduling.
- Planning Version: Confirm that the correct planning version is being used and that it allows scheduling.
- Production Version: Check the production version assigned to the order to ensure it is valid and allows scheduling.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or refer to SAP community forums for additional insights.
Get instant SAP help. Start your 7-day free trial now.
61592
Lot size area for version: from & to &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61591
Partial order cannot be released
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61594
Capacitites checked. No overload found.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61595
Assembly orders, changes are transferred to sales order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.