Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 497
Message text: Run schedule header & is blocked
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
The run schedule header that you called up is already being processed
by another user. Therefore, it is blocked.
Try to access this run schedule header later.
Error message extract from SAP system. Copyright SAP SE.
61497
- Run schedule header & is blocked ?The SAP error message "61497 Run schedule header & is blocked" typically indicates that there is a scheduling issue with a background job in the SAP system. This error can occur for various reasons, and understanding the cause is essential for resolving it.
Causes:
- Job Locking: The job may be locked due to another job running or being scheduled at the same time.
- Job Status: The job might be in a status that prevents it from being executed, such as "Released" or "Cancelled."
- Authorization Issues: The user or the job may not have the necessary authorizations to execute the job.
- System Configuration: There may be configuration issues in the job scheduling settings or the background processing system.
- Resource Constraints: The system may be experiencing resource constraints, preventing the job from being executed.
Solutions:
- Check Job Status: Use transaction code
SM37
to check the status of the job. Look for any jobs that may be blocking the execution of the job in question.- Release the Job: If the job is in a "Released" status, you may need to release it or delete it if it is no longer needed.
- Check for Locks: Use transaction code
SM12
to check for any locks that may be preventing the job from running. If you find locks, you may need to release them.- Review Authorizations: Ensure that the user or the job has the necessary authorizations to execute the job. You can check this in transaction
SU53
or by reviewing the user roles.- Adjust Scheduling: If there are multiple jobs scheduled at the same time, consider rescheduling them to avoid conflicts.
- System Resources: Monitor system resources to ensure that there are enough resources available for background processing. You can use transaction
SM50
to check the status of work processes.- Consult Logs: Check the job logs for any additional error messages or information that may provide insight into the issue.
Related Information:
SM37
: Monitor Background JobsSM12
: Display and Delete LocksSM50
: Monitor Work ProcessesSU53
: Display Authorization CheckIf the issue persists after trying the above solutions, it may be necessary to consult with your SAP Basis team or SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
61496
Conversion factor to unit of measure & for material & not maintained
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61495
Production order & has already been finally confirmed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61498
Run sched. hdr &1 cannot be deleted because run sched. qty still exists
What causes this issue? Run schedule header &V1& cannot be deleted as there are still planned orders for this version or production orders fo...
61499
Entered version does not appear in the planning table
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.