How To Fix 61487 - No planning calendar can be selected


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 487

  • Message text: No planning calendar can be selected

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 61487 - No planning calendar can be selected ?

    The SAP error message "61487 No planning calendar can be selected" typically occurs in the context of planning and scheduling within SAP systems, particularly in modules like SAP APO (Advanced Planning and Optimization) or SAP S/4HANA. This error indicates that the system is unable to find a suitable planning calendar for the operation you are trying to perform.

    Causes:

    1. Missing Planning Calendar: The planning calendar may not be defined in the system for the relevant planning area or product.
    2. Incorrect Configuration: The configuration settings for the planning calendar may be incorrect or incomplete.
    3. Master Data Issues: The master data (like material master, resource master, etc.) may not be properly set up to reference a planning calendar.
    4. Date Range Issues: The date range for the planning calendar may not cover the dates being used in the planning process.
    5. Authorization Issues: The user may not have the necessary authorizations to access the planning calendar.

    Solutions:

    1. Define a Planning Calendar:

      • Go to the relevant configuration transaction (e.g., SPRO) and ensure that a planning calendar is defined for the planning area or product.
      • Check the settings under "Advanced Planning" or "Production Planning" depending on your SAP version.
    2. Check Configuration:

      • Review the configuration settings for the planning area to ensure that the planning calendar is correctly assigned.
      • Ensure that the planning calendar is active and valid for the required time frame.
    3. Review Master Data:

      • Check the master data for the relevant materials or resources to ensure they are linked to the correct planning calendar.
      • Ensure that the planning calendar is assigned in the material master or resource master records.
    4. Adjust Date Ranges:

      • Verify that the date ranges for the planning calendar cover the dates you are trying to plan for.
      • If necessary, extend the validity period of the planning calendar.
    5. Check Authorizations:

      • Ensure that the user has the necessary authorizations to access and use the planning calendar.
      • Consult with your SAP security team if there are any authorization issues.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/MC62 (for planning calendar maintenance) or MD01 (for running MRP) depending on your specific scenario.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Refer to SAP Help documentation for detailed information on planning calendars and their configuration.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the relevant module.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant