Do you have any question about this error?
Message type: E = Error
Message class: 61 - Fehlermeldungen fuer Bedarfsplanung
Message number: 308
Message text: Scope of planning '&1' does not exist.
The scope of planning &v1& entered has not yet been created in
Customizing.
Define the scope of planning in Customizing under the following path:
Material requirements planning - Planning - Define scope of planning
for total planning run
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
61308
- Scope of planning '&1' does not exist. ?The SAP error message "61308 Scope of planning '&1' does not exist" typically occurs in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO). This error indicates that the system is unable to find the specified planning scope, which is essential for executing planning functions or processes.
Cause:
- Non-existent Planning Scope: The planning scope specified in the transaction or process does not exist in the system. This could be due to a typo or an incorrect reference.
- Inactive Planning Scope: The planning scope may exist but is not active or has been deactivated.
- Authorization Issues: The user may not have the necessary authorizations to access the specified planning scope.
- Configuration Issues: There may be issues with the configuration of the planning area or the planning scope itself.
Solution:
Verify Planning Scope:
- Check the spelling and ensure that the planning scope name is correct.
- Use transaction codes like
/SAPAPO/SDP94
(for APO) or the relevant transaction in IBP to list available planning scopes and confirm that the specified one exists.Activate Planning Scope:
- If the planning scope exists but is inactive, you may need to activate it. This can typically be done in the planning area configuration settings.
Check Authorizations:
- Ensure that the user has the necessary authorizations to access the planning scope. This may involve checking user roles and permissions in the SAP system.
Review Configuration:
- If the planning scope is part of a larger configuration, review the settings to ensure everything is set up correctly. This may involve checking the planning area, key figures, and other related settings.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on the planning scope and its configuration.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error.
Related Information:
/SAPAPO/SDP94
for APO or the equivalent in IBP.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
61307
Unit of measure conversion for material &1 of &2 terminated in &3
What causes this issue? The conversion of the unit of measure for material '&V1&' of '&V2&' '&V3&...
61306
No customer requirements exist for materials selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61309
Planning run for scope of planning is only possible in parallel mode
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
61310
The order was already checked according to ATP logic
What causes this issue? The order has already been checked using the ATP logic. The requested availability check for the planned independent requirem...
Click on this link to search all SAP messages.