How To Fix 61205 - MRP calculation only until the end of the short-term horizon


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 61 - Fehlermeldungen fuer Bedarfsplanung

  • Message number: 205

  • Message text: MRP calculation only until the end of the short-term horizon

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 61205 - MRP calculation only until the end of the short-term horizon ?
    The SAP error message 61205, which states "MRP calculation only until the end of the short-term horizon," typically occurs during the Material Requirements Planning (MRP) process. This message indicates that the MRP run is limited to the short-term horizon defined in the system settings, and it will not consider requirements beyond this period.
    
    Cause: Short-Term Horizon Setting: The MRP settings in the material master or MRP configuration may have a defined short-term horizon that restricts the planning to a specific timeframe. MRP Type: The MRP type assigned to the material (e.g., PD for MRP, VB for consumption-based planning) may influence how far into the future the MRP run will calculate requirements. Planning Parameters: The planning parameters set in the MRP configuration (transaction code OMD0) may limit the planning horizon. Material Master Data: The material master data may not be set up correctly, leading to restrictions in the planning horizon.
    Solution: Check MRP Settings: Go to the material master

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author