How To Fix 60391 - Approval date is after "Approval required by" date


60391 - Overview

  • Message type: E = Error

  • Message class: 60 - Real Estate

  • Message number: 391

  • Message text: Approval date is after "Approval required by" date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 60391 - Approval date is after "Approval required by" date ?
    The SAP error message 60391, which states "Approval date is after 'Approval required by' date," typically occurs in the context of workflows or approval processes within SAP systems. This error indicates that the date on which an approval was recorded is later than the deadline for that approval, which can lead to compliance issues or process delays.
    
    Cause: Date Mismatch: The approval date entered is later than the specified "Approval required by" date. Workflow Delays: There may have been delays in the workflow process that caused the approval to be recorded after the deadline. User Error: The user may have mistakenly entered the wrong date or failed to complete the approval process in a timely manner.
    Solution: Check Dates: Verify the approval date and the "Approval required by" date. Ensure that the approval date is not later than the required date. Adjust Approval Date: If the approval was mistakenly recorded with the wrong date, correct it to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author