How To Fix 5P368 - Warning: Check the dependent nodes and make any necessary adjustments


5P368 - Overview

  • Message type: E = Error

  • Message class: 5P - Error Messages for Schema, Pers.Calc.Rule and Feature Checks

  • Message number: 368

  • Message text: Warning: Check the dependent nodes and make any necessary adjustments

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 5P368 - Warning: Check the dependent nodes and make any necessary adjustments ?
    The SAP error message 5P368, which states "Warning: Check the dependent nodes and make any necessary adjustments," typically relates to issues in the configuration of dependent nodes in a hierarchical structure, such as in a project, network, or other organizational structures within SAP.
    
    Cause: Dependent Node Configuration: The error often arises when there are inconsistencies or misconfigurations in the dependent nodes of a project or network. This could be due to missing dependencies, incorrect settings, or changes made to the structure that have not been properly reflected in the dependent nodes. Data Integrity Issues: If the data integrity is compromised, such as when nodes are deleted or modified without updating dependent nodes, this warning may appear. Hierarchy Changes: Changes in the hierarchy or structure of nodes that are not properly synchronized can lead to this warning.
    Solution: Check Node Dependencies: Review the configuration of the nodes involved. Ensure that all dependent nodes are correctly set up

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker