Do you have any question about this error?
Message type: E = Error
Message class: 5P - Error Messages for Schema, Pers.Calc.Rule and Feature Checks
Message number: 040
Message text: Incorrect parametrization of the operation (space check)
You have entered a parameter where none belongs.
Select 'possible entries' to display parameter options for this
operation. This list also shows which positions must be blank.
Choose the required parameter from the list. The system automatically
places it in the correct position.
Dots indicate where values are to be entered. For information on the
meaning of parameters and the permissible values, read the online help
for the operation.
Error message extract from SAP system. Copyright SAP SE.
5P040
- Incorrect parametrization of the operation (space check) ?The SAP error message 5P040, which indicates "Incorrect parametrization of the operation (space check)," typically arises in the context of production planning and control, particularly when dealing with operations in a routing or production order. This error suggests that there is an issue with the parameters set for a specific operation, often related to space checks or capacity planning.
Causes:
- Incorrect Configuration: The operation may not be correctly configured in the routing or production order. This could include incorrect parameters for space requirements or capacity.
- Missing Master Data: Required master data, such as work centers or production resources/tools, may be missing or incorrectly defined.
- Capacity Constraints: The system may be unable to allocate the necessary resources due to capacity constraints or incorrect settings in the work center.
- Inconsistent Data: There may be inconsistencies in the data related to the operation, such as conflicting settings in the routing or production order.
Solutions:
- Check Routing and Operations: Review the routing for the production order and ensure that all operations are correctly defined. Verify that the parameters for each operation are set correctly.
- Review Work Center Settings: Check the configuration of the work centers involved in the operation. Ensure that the capacity and space requirements are correctly defined.
- Validate Master Data: Ensure that all necessary master data (e.g., materials, work centers, production resources/tools) is complete and correctly configured.
- Capacity Planning: Analyze the capacity planning settings to ensure that there are no constraints preventing the operation from being executed. Adjust the capacity settings if necessary.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and related configuration settings.
Related Information:
CO02
(Change Production Order), CR02
(Change Work Center), or C223
(Change Routing) to investigate and modify the relevant data.By following these steps, you should be able to identify and resolve the cause of the 5P040 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
5P039
No entry in T52BO for these parameters of the operation
What causes this issue? You have entered parameter values that do not exist or that cannot be used for the country grouping of the personnel calculat...
5P038
Special coding desired but does not exist for the check in T52BO
What causes this issue? Table T52BO specifies that a special code must be written for this parameter. However, this has not been done.How to fix this...
5P041
The specified time type is not in table T555A
What causes this issue? This operation can only access the time types that have been entered in table T555A.How to fix this error? Enter the time ty...
5P042
The specified daily work schedule is not in table T550A
What causes this issue? You can only use this operation to access the daily work schedules that are entered in table T550A.How to fix this error? En...
Click on this link to search all SAP messages.