Message type: E = Error
Message class: 5C - HR: Messages for Switzerland
Message number: 668
Message text: Output sequence doesn't match the PC schema entered
The chosen output sequence is not defined with the specified PC schema.
The report hasn't started.
After you have confirmed your choice of PC schema (press enter) you get
a list of suitable output sequences from value help.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
5C668
- Output sequence doesn't match the PC schema entered ?The SAP error message 5C668 indicates that there is a mismatch between the output sequence defined in the system and the PC (Process Control) schema that has been entered. This error typically occurs in the context of process control and production planning, where specific sequences of operations or outputs are expected.
Cause:
- Mismatch in Output Sequence: The output sequence defined in the system does not match the expected sequence in the PC schema. This could be due to changes in the production process or incorrect configuration.
- Configuration Issues: The configuration settings for the output sequence or the PC schema may not be aligned, leading to discrepancies.
- Data Entry Errors: Incorrect data entry when defining the output sequence or the PC schema can lead to this error.
- Versioning Issues: If there are multiple versions of the output sequence or schema, the system may be referencing an outdated or incorrect version.
Solution:
- Check Output Sequence Configuration: Review the output sequence configuration in the SAP system. Ensure that it matches the expected configuration in the PC schema.
- Verify PC Schema: Check the PC schema settings to ensure that they are correctly defined and that they correspond to the output sequence you are trying to use.
- Correct Data Entry: If there are any discrepancies in data entry, correct them. Ensure that all relevant fields are filled out correctly.
- Update or Reconfigure: If there have been changes in the production process, update the output sequence or reconfigure the PC schema to reflect these changes.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring output sequences and PC schemas.
- Testing: After making changes, conduct tests to ensure that the output sequence now matches the PC schema and that the error no longer occurs.
Related Information:
C223
for maintaining output sequences) to access and modify the relevant configurations.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
5C667
Output sequence is not scheduled for current report
What causes this issue? The chosen output sequence is not defined with the current report.System Response The output sequence is not accepted ie the...
5C666
Employee has been assigned to fund &1
What causes this issue? No record of infotype "basic data PF" (0278) was found for one of the selected funds for the employee on payment da...
5C669
For immediate output, an output sequence must be specified
What causes this issue? If you want an immediate SAPscript display, you must define the display sequence before the report start. This ensures that t...
5C670
No '&1' period has been defined for the selected PC schema
What causes this issue? A setting is missing for the chosen day with which the processing is controlled at time &V1&.System Response Process...
Click on this link to search all SAP messages.