How To Fix 40016 - No (suitable) phase selected


40016 - Overview

  • Message type: E = Error

  • Message class: 40 - Messages for Process Orders

  • Message number: 016

  • Message text: No (suitable) phase selected

  • Show details Hide details
  • What causes this issue?

    This message is used in the following instances:
    Calling the process instruction overview:
    You have tried to call the process instruction overview without
    selecting a phase first.
    Creating control recipes
    To create a control recipe, you must explicitly or implicitly select
    phases.
    You explicitly select phases by flagging them in the operation/phase
    overview. You select phases implicitly by flagging their superior
    operation or by executing the "Create control recipe" function for the
    entire order.
    &NOTE&
    Phases for which a control recipe has already been generated are no
    longer selected by the system. Therefore, this message is also
    displayed when you only select phases that have already been used to
    generate control recipes.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Flag at least one phase.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 40016 - No (suitable) phase selected ?
    The SAP error message "40016 No (suitable) phase selected" typically occurs during the execution of a process that requires a specific phase to be selected, such as during the execution of a project or a task in the SAP system. This error indicates that the system could not find a suitable phase for the operation you are trying to perform.
    Causes:
    
    Missing Phase Configuration: The project or task you are working on may not have any phases defined or configured properly.
    Incorrect Selection: The user may not have selected a valid phase that is required for the operation.
    Authorization Issues: The user may not have the necessary authorizations to access or select the required phase.
    Data Inconsistencies: There may be inconsistencies in the data related to the project or task phases.
    
    Solutions:
    
    
    Check Phase Configuration:
    
    Navigate to the project or task settings and ensure that the necessary phases are defined and configured correctly.
    If you are using a project

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant