Do you have any question about this error?
Message type: E = Error
Message class: 3F - Compensation Management
Message number: 860
Message text: Scenario group &1: No account assignment object planned
No account assignment objects could be determined for scenario group
&v1&. This is either because you have not maintained any account
assignment objects, or the scenario group was saved with an inactive
calculation.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check to see if account assignment objects (such as cost centers,
orders, ...) exist. If they are not available, assign the account
assignment objects to the organizational structure, and recreate the
scenario group.
If the scenario group contains account assignment objects, the scenario
group must be calculated again, by using the administration transaction
in Personnel Cost Planning.
Error message extract from SAP system. Copyright SAP SE.
3F860
- Scenario group &1: No account assignment object planned ?The SAP error message 3F860 indicates that there is an issue with the account assignment object in a planning scenario. Specifically, it means that the system cannot find a planned account assignment object for the specified scenario group. This error typically occurs in the context of SAP's planning applications, such as SAP Integrated Business Planning (IBP) or SAP S/4HANA.
Cause:
The error can be caused by several factors, including:
- Missing Account Assignment Object: The account assignment object that is required for the planning scenario is not defined or is missing in the system.
- Incorrect Configuration: The configuration for the planning scenario may not be set up correctly, leading to the system being unable to find the necessary account assignment objects.
- Data Issues: There may be issues with the data being used in the planning scenario, such as missing or incorrect entries in the relevant tables.
- Authorization Issues: The user may not have the necessary authorizations to access the account assignment objects.
Solution:
To resolve the error, you can take the following steps:
Check Configuration:
- Verify the configuration of the planning scenario in the relevant transaction (e.g., transaction code
/SAPAPO/SDP94
for SAP APO).- Ensure that the account assignment objects are correctly defined and linked to the scenario group.
Review Account Assignment Objects:
- Check if the required account assignment objects exist in the system. You can do this by navigating to the relevant configuration or master data areas.
- If they are missing, you may need to create or define them.
Data Validation:
- Validate the data being used in the planning scenario. Ensure that all necessary data entries are present and correct.
- Check for any inconsistencies or missing data that could lead to this error.
Authorization Check:
- Ensure that the user has the necessary authorizations to access the account assignment objects. You may need to consult with your SAP security team to verify this.
Consult Documentation:
- Refer to SAP documentation or notes related to the specific planning application you are using for any additional troubleshooting steps or known issues.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. Provide them with the error message details and any relevant configuration or data information.
Related Information:
/SAPAPO/SDP94
, /SAPAPO/MC62
, or /N/SCMTMS/PLANNING
.By following these steps, you should be able to identify and resolve the cause of the error message 3F860 in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
3F859
Data transfer for controlling area &1 has already been executed
What causes this issue? A Personnel Cost Planning planning version for controlling area &v1& and fiscal year &v2& has already been tr...
3F858
Select the line that you want to process
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
3F861
Scenario group &1: Cost element &2 of cost item &3 not defined
What causes this issue? Cost element &v2& has already been assigned to wage element &v3& in scenario group &v1&. The cost ele...
3F862
Organizational unit &1 &2 are used in several scenario groups
What causes this issue? Organizational unit &v2& (&v1&) has already been planned in scenario group &v3& for period &v4&am...
Click on this link to search all SAP messages.