Message type: E = Error
Message class: 34 - Messages for Sales Configuration Engine (SCE)
Message number: 229
Message text: New conflict: &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
34229
- New conflict: &1 ?The SAP error message "34229 New conflict: &1" typically occurs in the context of SAP's Material Management (MM) or Production Planning (PP) modules, particularly when dealing with conflicts in planning or scheduling. The error indicates that there is a new conflict detected in the system, which could be related to various factors such as resource allocation, scheduling, or material availability.
Cause: Resource Conflicts: The error may arise when multiple production orders or processes are trying to use the same resource (e.g., machine, labor) at the same time. Material Availability: If the required materials for a production order are not available or are reserved for another order, this can lead to conflicts. Scheduling Issues: Conflicts can occur if there are overlapping time slots for production orders or if the lead times are not properly accounted for. Capacity Planning: If the capacity of a resource is exceeded due to multiple orders being scheduled simultaneously, this can trigger
Get instant SAP help. Sign up for our Free Essentials Plan.
34225
Specialization of &1 for &2 deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
34224
&1 specialized for &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
34230
Conflict &1 deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
34234
Pricing factor entry &2 for condition &1 by &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.