Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 058
Message text: BOM group & for material & & is not valid on &
You want to change or display BOM group &V1& for material &V2& in plant
&V3& and have entered date &V4& in field F<LS>Valid from</>.
You cannot change/display the BOM, as the BOM is not valid on this
date.
If you want to display the BOM group in its maximum validity period,
proceed as follows:
Choose <LS>BOM group -> Display</>.
Enter the special character "!" at the beginning of the fields
<LS>Valid from</> and <LS>Valid to</>.
You see a summarized BOM of the BOM group.
On the alternative overivew, you see an overview of the validity period
of the individual BOMs in this BOM group.
Error message extract from SAP system. Copyright SAP SE.
29058
- BOM group & for material & & is not valid on & ?The SAP error message "29058 BOM group & for material & & is not valid on &" typically indicates that there is an issue with the Bill of Materials (BOM) configuration for a specific material in the system. This error can arise due to several reasons, and understanding the cause is essential for finding a solution.
Cause:
- Invalid BOM Group: The BOM group specified for the material may not be valid or may not exist in the system.
- Material Status: The material may have a status that prevents it from being used in BOMs (e.g., it may be marked as inactive).
- Plant Assignment: The BOM group may not be assigned to the plant where the material is being used.
- Date Validity: The BOM group may not be valid for the date specified in the transaction. BOMs can have validity periods, and if the date falls outside this range, the error will occur.
- Configuration Issues: There may be configuration issues in the BOM settings or the material master data.
Solution:
- Check BOM Group: Verify that the BOM group specified in the error message exists and is correctly configured in the system. You can do this by navigating to the BOM group configuration in the SAP system.
- Review Material Master: Check the material master data for the material in question. Ensure that the material is active and has the correct status.
- Validate Plant Assignment: Ensure that the BOM group is assigned to the correct plant. You can check this in the BOM configuration settings.
- Check Validity Dates: Review the validity dates of the BOM group. Make sure that the date you are trying to use falls within the valid range.
- Consult Documentation: If you are unsure about the configuration, refer to SAP documentation or consult with your SAP administrator or functional consultant for guidance.
- Transaction Codes: Use transaction codes like
CS01
(Create BOM),CS02
(Change BOM), orCS03
(Display BOM) to check the BOM details and make necessary adjustments.Related Information:
If the problem persists after checking these areas, it may be beneficial to involve your SAP support team or consult with SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
29057
Date &, change number & and version & determined from revision level &
What causes this issue? You are processing a document structure with reference to revision level &V4&.System Response The system determines ...
29056
Revision level & not found for document &
What causes this issue? You want to change or display the BOM for document &V2& at revision level &V1&. This is not possible, as no c...
29059
BOM group & & is not valid on &
What causes this issue? You want to change or display BOM group &V1& in plant &V2& and have entered the date &V3& in the <...
29060
BOM for material & & not valid on &
What causes this issue? You want to display or change the BOM for material &V1& in plant &V2&. You entered the valid-from date &V...
Click on this link to search all SAP messages.