Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 050
Message text: Date & and change no. & determined from revision level &
You are processing a BOM with reference to revision level &V3&.
The system determines change number &V2&, since revision level &V3& was
assigned for this change number. The valid-from date of the change
master record (&V1&) is displayed.
If you confirm this message, you process the BOM with reference to
change number &V2&.
Error message extract from SAP system. Copyright SAP SE.
29050
- Date & and change no. & determined from revision level & ?The SAP error message 29050, which states "Date & and change no. & determined from revision level &," typically occurs in the context of change management and version control within SAP systems, particularly in modules like SAP PLM (Product Lifecycle Management) or SAP MM (Materials Management).
Cause:
This error usually arises when there is a mismatch or inconsistency between the revision level of a material or document and the associated change number or effective date. It can occur due to:
- Incorrect Change Number: The change number being referenced may not be valid for the specified revision level.
- Date Issues: The effective date for the change number may not align with the revision level being used.
- Configuration Issues: There may be configuration issues in the change management settings or the material master data.
- Missing Data: Required data for the change number or revision level may be missing or incorrectly set up.
Solution:
To resolve this error, you can take the following steps:
Check Change Number: Verify that the change number you are using is valid and corresponds to the correct revision level. You can do this by checking the change management records in SAP.
Review Effective Dates: Ensure that the effective date for the change number is correctly set and that it matches the expected date for the revision level.
Validate Configuration: Review the configuration settings for change management in your SAP system. Ensure that all necessary settings are correctly configured.
Material Master Data: Check the material master data for the item in question. Ensure that the revision level and change number are correctly assigned.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling change management and revision levels.
SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
Contact Support: If the issue persists, consider reaching out to your SAP support team or consulting with SAP experts for further assistance.
Related Information:
CC01
(Create Change Master), CC02
(Change Change Master), and CC03
(Display Change Master) to manage change numbers.By following these steps and understanding the context of the error, you should be able to resolve the issue effectively.
Get instant SAP help. Start your 7-day free trial now.
29049
A change number was entered, so the revision level is ignored
What causes this issue? You want to change or display a BOM and have entered both a change number and a revision level. The revision level is an addi...
29048
No change number found for BOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
29051
Revision level & does not exist for material &
What causes this issue? You want to change or display the BOM for material &V2& with reference to revision level &V1&. This is not po...
29052
Valid-from date is in the past
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.