Message type: E = Error
Message class: 29 - Bills of Material
Message number: 049
Message text: A change number was entered, so the revision level is ignored
You want to change or display a BOM and have entered both a change
number and a revision level.
The revision level is an additional identifier for the change status of
a material with reference to a particular change number.
If you enter a change number, the system determines the
<LS>valid-from</> date from the relevant change master record.
In this case, the system ignores the revision level, even if the change
number and the revision level do not refer to the same change status of
a material.
If you confirm this warning message, you see the item overview.
Error message extract from SAP system. Copyright SAP SE.
29049
- A change number was entered, so the revision level is ignored ?The SAP error message 29049, which states "A change number was entered, so the revision level is ignored," typically occurs in the context of material management or engineering change management within SAP. This message indicates that a change number has been specified for a material or document, and as a result, the system is disregarding the revision level associated with that material or document.
Cause:
- Change Number Entry: The primary cause of this error is that a change number has been entered in a transaction where the system expects a revision level. The change number is used to track changes made to materials or documents, and when it is provided, the system prioritizes it over the revision level.
- Configuration Settings: The system may be configured to require a change number for certain operations, which can lead to this message if the user is trying to reference a specific revision level instead.
Solution:
- Review Change Number: Ensure that the change number entered is correct and relevant to the operation you are performing. If you intended to use a revision level instead, remove the change number from the input.
- Check Configuration: If you are consistently encountering this message and it is causing issues, review the configuration settings in your SAP system related to change management and revision levels. You may need to consult with your SAP administrator or a functional consultant to adjust these settings.
- Documentation: Refer to the SAP documentation or help files for the specific transaction you are using to understand how change numbers and revision levels are intended to work together.
- Training: If this error is common among users, consider providing training or guidance on how to properly use change numbers and revision levels in the relevant transactions.
Related Information:
If the issue persists after following these steps, it may be beneficial to reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
29048
No change number found for BOM
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
29047
BOM & & & is locked for changes with change number &
What causes this issue? You want to change BOM &v1& &v2& &v3& using change number &V4&. However, in the change master...
29050
Date & and change no. & determined from revision level &
What causes this issue? You are processing a BOM with reference to revision level &V3&.System Response The system determines change number &...
29051
Revision level & does not exist for material &
What causes this issue? You want to change or display the BOM for material &V2& with reference to revision level &V1&. This is not po...
Click on this link to search all SAP messages.