Do you have any question about this error?
Message type: E = Error
Message class: 29 - Bills of Material
Message number: 018
Message text: BOM is allocated to other plants
You want to change the bill of material.
As this BOM is allocated to other plants, the changes become effective
in all the plants to which the BOM is allocated.
You see this warning message because the system makes the required
checks (such as checking for a material master) in all the plants, and
the change you want to make may be rejected. This would be the case,
for example, if the material master for a new material item is not
maintained in all plants.
If you want to make the change, confirm this warning message.
Error message extract from SAP system. Copyright SAP SE.
29018
- BOM is allocated to other plants ?The SAP error message 29018, which states "BOM is allocated to other plants," typically occurs when you are trying to create or modify a Bill of Materials (BOM) in a plant where the BOM is already allocated to another plant. This can happen in various scenarios, such as when you are trying to create a BOM for a material that already has a BOM assigned to a different plant.
Cause:
- BOM Allocation: The BOM you are trying to create or modify is already assigned to a different plant. In SAP, BOMs can be plant-specific, meaning that each plant can have its own BOM for the same material.
- Material Master Settings: The material may have been set up in such a way that it is linked to a specific plant, and the BOM is not allowed to be shared across plants.
- Data Entry Error: There may be a mistake in the plant code or material number being used, leading to the system not recognizing the intended plant for the BOM.
Solution:
- Check Existing BOMs: Use transaction code
CS03
(Display BOM) to check if a BOM already exists for the material in another plant. If it does, you may need to either modify that BOM or create a new BOM for the intended plant.- Create BOM for the Correct Plant: If you need to create a BOM for a different plant, ensure you are using the correct plant code when creating the BOM. Use transaction code
CS01
(Create BOM) and specify the correct plant.- Copy BOM: If you want to use the existing BOM as a template, you can copy it to the new plant using transaction code
CS01
and selecting the "Copy" option.- Check Material Master: Ensure that the material master data is correctly set up for the plant you are working with. Use transaction code
MM03
(Display Material) to verify the settings.- Consult with SAP Basis or Functional Team: If you are unsure about the settings or if the issue persists, consult with your SAP Basis or functional team for further assistance.
Related Information:
CS01
: Create BOMCS02
: Change BOMCS03
: Display BOMMM03
: Display MaterialBy following these steps, you should be able to resolve the error message 29018 and successfully manage your BOMs in SAP.
Get instant SAP help. Start your 7-day free trial now.
29017
BOM may be relevant to plant maintenance
What causes this issue? You want to create a new alternative for a BOM with a the material/plant/usage you entered (-> multiple BOM). The BOM usa...
29016
Material/usage ignored
What causes this issue? You want to edit the BOM group for a material BOM. Within the selected plant, the BOM group is identified either by the name ...
29019
BOM is relevant to plant maintenance
What causes this issue? Due to the definition of the BOM usage, the BOM is relevant to plant maintenance. In a plant maintenance BOM, there are items...
29020
You are not authorized for authorization group &
What causes this issue? The authorization group you want to enter is not within the range of values recorded in your user profile for the authorizati...
Click on this link to search all SAP messages.