How To Fix 1X084 - The selected nodes have been reassigned


SAP Error Message - Details

  • Message type: E = Error

  • Message class: 1X - General hierarchy maintenance tool message

  • Message number: 084

  • Message text: The selected nodes have been reassigned

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message 1X084 - The selected nodes have been reassigned ?
    The SAP error message 1X084 ("The selected nodes have been reassigned") typically occurs in the context of SAP's project management or project system modules, particularly when dealing with network activities or WBS (Work Breakdown Structure) elements. This error indicates that the nodes (or elements) you are trying to work with have been reassigned to a different project or structure, which can lead to inconsistencies in the data you are trying to manipulate.
    Causes:
    
    Reassignment of Nodes: The nodes (WBS elements, activities, etc.) you are trying to access or modify have been moved to a different project or hierarchy.
    Data Consistency Issues: The system may have detected that the nodes you are working with are no longer valid in the context of your current project or operation.
    User Permissions: Sometimes, the error can arise due to insufficient permissions to access or modify the reassigned nodes.
    
    Solutions:
    
    Verify Node Assignment: Check the current assignment of the nodes in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker