Do you have any question about this error?
Message type: E = Error
Message class: 13PS - Store dummy messages for Payment Summary to cater PA LOG
Message number: 707
Message text: &1&2&3&4
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
13PS707
- &1&2&3&4 ?The SAP error message 13PS707 typically relates to issues in the Project System (PS) module, often indicating a problem with the assignment of resources or costs to a project. The parameters
&1
,&2
,&3
, and&4
usually represent specific details about the error, such as project numbers, resource IDs, or other relevant identifiers.Cause:
The error can be caused by several factors, including but not limited to:
- Incorrect Project Structure: The project may not be set up correctly, leading to issues with resource assignments.
- Missing Master Data: Required master data (like cost centers, work breakdown structures, or resources) may be missing or incorrectly configured.
- Authorization Issues: The user may not have the necessary permissions to perform the action related to the project.
- Inconsistent Data: There may be inconsistencies in the data entered for the project, such as overlapping dates or incorrect resource allocations.
Solution:
To resolve the error, consider the following steps:
- Check Project Structure: Review the project structure to ensure that all components are correctly defined and linked.
- Verify Master Data: Ensure that all necessary master data is available and correctly configured. This includes checking for valid cost centers, resources, and WBS elements.
- Review Authorizations: Confirm that the user has the appropriate authorizations to access and modify the project data.
- Data Consistency Check: Run consistency checks on the project data to identify and correct any inconsistencies.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its parameters.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to review and modify project details.Always ensure to back up any critical data before making changes to project configurations or master data.
Get instant SAP help. Start your 7-day free trial now.
13PS706
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS705
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS708
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
13PS709
&1&2&3&4
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.