Do you have any question about this error?
Message type: E = Error
Message class: REMPT - Message Class for REM Planning Table (Rel. 99)
Message number: 311
Message text: Probleme bei der Terminierung von Plaufs beim Material &1 Version &2
Problems occurred when scheduling the planned order.
This may be due to one of the following reasons, for example:
The scheduling level (detailed or rate-based planning) you used to
access the planning table and the one used for scheduling are not the
same.
No suitable routing could be found.
One possibility of finding out what is causing the problem is:
To access the planned order from the detailed dialog box in the table
via "Change" and reschedule the planned order. Check the scheduling log
by choosing "Goto --> Scheduling log". More information is displayed in
the log's warning or error messages.
You define the scheduling levels for the various types of planned
orders in Customizing.
<DS:TRAN.OPU5>Proceed with function</>
You must enter the routings in the production version in the material
master record (MRP 4 screen) according to the scheduling level settings
in Customizing (determine scheduling and capacity requirements via
detailed or rate-based planning).
<DS:TRAN.MM02>Proceed with function</>
If you have made any changes, you have to restart the planning table to
activate the changes.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
REMPT311
- Probleme bei der Terminierung von Plaufs beim Material &1 Version &2 ?Get instant SAP help. Start your 7-day free trial now.
REMPT310
Terminierungsfehler: &
Was verursacht dieses Problem? A problem occurred when determining the column in which the planned order is to be created.Wie behebe ich diesen Feh...
REMPT304
Keine Kapazitätsplanung aktiv
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
REMPT312
Terminierung von Plaufs beim Material &1 Version &2 nicht ausgeführt
Was verursacht dieses Problem? The planned order was not scheduled. This may be due to one of the following reasons, for example: The scheduling le...
REMPT313
Terminierungsebenen im Customizing sind nicht gepflegt.
Was verursacht dieses Problem? Problems occurred when scheduling the planned order. This may be as a result of the following: You have not maintain...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.