How To Fix PV457 - Gesamtbedarf von & Veranstaltungen konnte nur durch & gedeckt werden


PV457 - Overview

  • Message type: E = Error

  • Message class: PV - Training and Event Management

  • Message number: 457

  • Message text: Gesamtbedarf von & Veranstaltungen konnte nur durch & gedeckt werden

  • Show details Hide details
  • Was verursacht dieses Problem?

    Your demand for business events is greater that the number of events
    you can create in the planning. This is becuase of the planning
    options.

    Wie behebe ich diesen Fehler?

    If you wish to change the planning options, cancel the log and deselect
    the option 'Resource requirements covered'. The business events will
    then be created despite missing resources.
    A second possibility open to you is to reduce the number of resources
    flagged as 'required' in the 'Presettings resources/resource types' and
    to start the planning again.
    As a third alternative, you can assign new resources to the critical
    resource types.
    You can, however, accept the smaller number of business events proposed
    and carry out the planning for the remaining demand at a later time.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler PV457 - Gesamtbedarf von & Veranstaltungen konnte nur durch & gedeckt werden ?







Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author