How To Fix O1089 - Zur Zeit wird nur 1 Liefereinteilung im Mengenplan unterstützt.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 089

  • Message text: Zur Zeit wird nur 1 Liefereinteilung im Mengenplan unterstützt.

  • Show details Hide details
  • Was verursacht dieses Problem?

    During call-off processing, you entered more than one
    <DS:GLOS.delivery date>delivery date</> for a schedule line in
    MM or SD.
    &SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
    This message is controlled by Table T160M (E=Error, W=Warning, blank=no
    message); the default is ERROR, because only one Qty.schedule is
    created for each item, and it depends on the delivery date (valid to
    date in the call-off quantity schedule).

    Wie behebe ich diesen Fehler?

    If error message appears, delete the schedule line in document
    maintenance so that there is only one schedule line for each item.
    &DEPENDENCIES&
    <DS:DE.KAPPL>Valid application in Table TOIAG</>
    &REFERENCE&
    <DS:NA.O1093>Delivery date</>

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler O1089 - Zur Zeit wird nur 1 Liefereinteilung im Mengenplan unterstützt. ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant