How To Fix O1079 - Kontrakt-MP-Einteilung für Lieferdatum & nicht gefunden


SAP Error Message - Details

  • Message type: E = Error

  • Message class: O1 - IS-Oil : Message pool exchanges

  • Message number: 079

  • Message text: Kontrakt-MP-Einteilung für Lieferdatum & nicht gefunden

  • Show details Hide details
  • Was verursacht dieses Problem?

    For call-offs, the system obtains the relevant contract scheduling
    period by using the delivery date of the call-off. The scheduling date
    of the relevant contract schedule line is the "valid from" proposal of
    the call-off validity period.

    Systemantwort

    Serious error.

    Wie behebe ich diesen Fehler?

    Enter a valid delivery date which falls within the range of the
    contract quantity schedule.
    Please check the corresponding contract quantity schedule or the given
    delivery date of the call-off. There may be a discrepency between the
    first scheduling date of the contract and the "valid from" (start date)
    of the validity period.

    Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE


Smart SAP Assistant

  • Was ist die Ursache und Lösung für den SAP Fehler O1079 - Kontrakt-MP-Einteilung für Lieferdatum & nicht gefunden ?




    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Zugehörige SAP-Fehlermeldungen

Klicken Sie auf die Links unten, um die folgenden verwandten Nachrichten anzuzeigen:

Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author