Do you have any question about this error?
Message type: E = Error
Message class: O1 - IS-Oil : Message pool exchanges
Message number: 040
Message text: Achtung: & manuell geändert, siehe Referenzbelege/Mengenplan
The quantity has been manually changed. Please see reference
(follow-on) documents.
In the quantity schedule, you can usually only maintain the scheduled
quantity at a value less than or equal to the item quantity (other
qty.fields are locked). With this function (built-in Report ROIACM00),
you can correct the &V1& quantity in whatever way you choose.
Avoid manual changes, use them only as a last resort to correct values.
If it is necessary to change the quantity manually using ROIACM00,
first go to document maintenance to check if the relevant document is
locked (ROIACM00 does not use separate enqueue logic), then start a
second session and start the report by entering an update parameter and
the special function, "CHRQ". The function might be necessary when
quantities are to be called, before the corresponding Qty.schedule has
been created (if the Qty. schedule is created subsequently, call-offs
which have already been made are not taken into account).
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
O1040
- Achtung: & manuell geändert, siehe Referenzbelege/Mengenplan ?Get instant SAP help. Start your 7-day free trial now.
O1039
Keine freie seq.Segmentnr., bitte neu numerieren (& &)
Was verursacht dieses Problem? It may be necessary to renumber after a Qty.schedule has been copied, inserted or split. (After using line functions...
O1038
SICHERN nicht erforderlich, keine Änderung (& &)
Was verursacht dieses Problem? It is only possible in document maintenance to save temporarily stored data from the quantity schedule in the databa...
O1041
Rücklieferungen bewirken immer Fortschreibung des Kontrakt-Mengenplans
Was verursacht dieses Problem? <DS:GLOS.returns>Return orders</> exist in the selected period.Systemantwort The system always updates...
O1042
Anlegen Kontrakt-MP-Pos. &: & & & bereits vorhanden.
Was verursacht dieses Problem? The contract quantity schedule item &V1& should be created at this point, but a &v2& quantity alread...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.