Do you have any question about this error?
Message type: E = Error
Message class: O1 - IS-Oil : Message pool exchanges
Message number: 028
Message text: WEmenge um & & über verfügb.M. (MP-Periode & &)
<DS:GLOS.goods receipt>Goods receipt</> quantity exceeds the available
quantity in the quantity schedule, for this item the
<DS:DE.UEBTK>unlimited overdelivery indicator </>
is set, which means that overdelivery is permitted.
&SYSTEM_RESPONSE& / &SYSTEM_MESSAGE&
This message is controlled by Table T160M (Warning/ Error/ no message).
If <DS:GLOS.movement type>movement type</> is "cancel goods receipt",
you always get a warning, because the cancellation increases the open
qty. The message refers to the Qty.schedule of the
<DS:GLOS.purchase order>purchase order</>
(<DS:GLOS.release order>call-off</>). The message is used in MM. If the
message contains only one date, the check refers to a single scheduling
period, otherwise the check refers to the validity period of the
Qty.schedule.
Check your input and the related Qty.schedule; the sum of scheduled
qty. of the related call-off may be less than the item qty.
&DEPENDENCIES&
<DS:DE.OIA_SMENGE>Reference documents</>
&reference&
<DS:NA.O1007>If overdelivery indicator NOT set</>
INCLUDE OIA_QS_SETGET_OI4OI5
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
O1028
- WEmenge um & & über verfügb.M. (MP-Periode & &) ?Get instant SAP help. Start your 7-day free trial now.
O1027
Letztes Planungsdatum & gegen Unterteilungsschlüssel prüfen.
Was verursacht dieses Problem? It could be that the last scheduling period does not match the <DS:DE.BISDAT>"valid-to" date</>...
O1026
Erstes Planungsdatum paßt nicht zu "Gültig von" &, bitte prüfen
Was verursacht dieses Problem? "Valid from" date in quantity schedule does not match the first schedule line in the quantity schedule. &a...
O1029
Liefermenge um & & über verfügb.M. (MP-Periode & &)
Was verursacht dieses Problem? The delivered quantity exceeds the available quantity in the quantity schedule for this item, the <DS:DE.UEBTK_V&...
O1030
& & & zu einigen Einteil. bereits vorh. (Menge &)
Was verursacht dieses Problem? Normally it is NOT possible to delete the quantity schedule if scheduling lines have already been called off (if con...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.