Do you have any question about this error?
Message type: E = Error
Message class: KW - CO-ABC Activity-Based Costing
Message number: 113
Message text: Keine Systemressourcen für Parallelschritt &1
You have scheduled the template allocation as a background job with the
server group &V3&. This leads to parallel processing. The scheduling of
the prallel step &V1& failed after &V2& attempts due to a lack of
system resources in the server group &V3&.
The parallel processing cannot be completed or is not possible.
Repeat the template allocation (if appropriate, only for the affected
selection packages) and choose another server group that has more
system resources.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KW113
- Keine Systemressourcen für Parallelschritt &1 ?Get instant SAP help. Start your 7-day free trial now.
KW112
Systemfehler: &1 beim Empfangen von Parallel-Schritt &4
Was verursacht dieses Problem? When parallel step &V4& was received, a system error occurred: Error text: &V2&&V3&Systemant...
KW111
Systemfehler: &1 beim Einplanen von Parallel-Schritt &4
Was verursacht dieses Problem? When you scheduled parallel step &V4&, a system error occurred. Error text: &V2&&V3&Systeman...
KW114
Keine sinnvollen Paketgrößen für Parallelverarbeitung ermittelbar
Was verursacht dieses Problem? You have scheduled the template allocation in Profitability Analysis as a background job and specified a server grou...
KW115
Keine passende Verdichtungsebenen vorhanden
Was verursacht dieses Problem? No suitable summarization level for template allocation to profitability analysis.Systemantwort The system tries t...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.