Do you have any question about this error?
Message type: E = Error
Message class: KV - Variance Analysis for Cost Centers and Cost Objects
Message number: 173
Message text: Kalkulation zum Projekt & nicht vorhanden
The system is attempting to determine the target costs on the basis of a
cost estimate for the project.
If you are using a valuated project stock, you can do the following on
the basis of these target costs:
Valuate work in process (WIP) at target costs
Valuate confirmed scrap quantities
Determine variances between the target costs and the actual costs
In the WIP calculation process, the system then attempts to valuate the
work in process on the basis of a project cost estimate if you have
specified in the <LS>valuation variant for work in process and scrap</>
that valuation should be made on the basis of the current standard cost
estimate and if a valuation strategy is defined in the requirements
class that causes the standard price of the valuated project stock to be
determined on the basis of the project cost estimate.
When it calculates the variances, the system attempts to valuate the
confirmed scrap quantities on the basis of a project cost estimate if
you have specified in the <LS>valuation variant for work in process and
scrap</> that the valuation should be made on the basis of the current
standard cost estimate and if a valuation strategy is defined in the
requirements class that causes the standard price of the valuated
project stock to be calculated on the basis of the project cost e
stimate. Another requirement is that the <LS>Scrap</> indicator be set
in the variance key.
When it calculates the variances, the system attempts to valuate the
total variance on the basis of the project cost estimate if it has been
specified in the target cost version that the target costs are to be
calculated on the basis of a current standard cost estimate and if a
valuation strategy has been defined in the requirements class that
causes the standard price of the valuated project stock to be calculated
on the basis of the project cost estimate.
The system cannot find a project cost estimate for the project. This
could be caused by any of the following reasons:
The cost estimate does not exist.
The cost estimate is not valid on the appropriate date.
The cost estimate does not have an itemization.
Note that you can only valuate work in process and scrap at target costs
using a product cost estimate with quantity structure. A unit cost
estimate cannot be used to valuate work in process and scrap.
The system cannot calculate any target costs.
Check the following in Customizing:
The valuation variant for work in process and scrap
The target cost version
The requirements class
If necessary, change the settings in these Customizing steps, or create
a cost estimate for the project.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KV173
- Kalkulation zum Projekt & nicht vorhanden ?Get instant SAP help. Start your 7-day free trial now.
KV172
Kalkulation zum Kundenauftrag & & nicht vorhanden
Was verursacht dieses Problem? The system is attempting to determine the target costs on the basis of a sales order cost estimate. If you are using...
KV171
Kalkulation nicht vorhanden. Material/Werk/KVers/Kalk.Var./Datum: & & & &
Was verursacht dieses Problem? The system is attempting to calculate target costs for the following purposes: To valuate work in process To valuate...
KV174
Bezugsobjekt & ist nicht zulaessig
Was verursacht dieses Problem? No target costs can be calculated on the basis of this cost estimate. For the valuation of <DS:GLOS.3526B774AFAB5...
KV175
Zum Auftrag wurde kein Arbeitsplan/Planungsrezept gefunden
Selbsterklärende Nachricht Da SAP der Meinung ist, dass diese spezielle Fehlermeldung 'selbsterklärend' ist, wurden keine weiteren Informationen geg...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.