Do you have any question about this error?
Message type: E = Error
Message class: KP - CO-OM Planning
Message number: 285
Message text: Leistungsbeziehung mit unterschiedlichen Objektwährungen
In the price calculation, you specified that the object currency
amounts are to be iterated independently. This function only works if
all objects, for which activity links between one another exist, have
the same object currency. However, an activity link exists between
object &V1& and &V2& although these two have different object
currencies.
The prices are calculated via iteration only in the controlling area
currency, the prices in object currency are calculated from the prices
in controlling area currency by means of foreign currency translation.
Das System gibt eine Fehlermeldung aus und erlaubt Ihnen nicht, mit dieser Transaktion fortzufahren, bis der Fehler behoben ist.
Fehlermeldungsextrakt aus SAP-System. Copyright SAP SE
KP285
- Leistungsbeziehung mit unterschiedlichen Objektwährungen ?Get instant SAP help. Start your 7-day free trial now.
KP284
Verbuchung Fixkostenvorverteilung mit Fehler beendet
Was verursacht dieses Problem? An error occurred while the system was updating the predistribution of fixed costs.Systemantwort The update is not...
KP283
&: Kosten trotz Leistung 0
Was verursacht dieses Problem? The planned or posted activity for &V1& is 0. Despite this, costs have been planned or posted in period(s) &...
KP286
Iteration nach &V1& Schritten abgebrochen
Was verursacht dieses Problem? The iteration of &V3& in controlling area &V2& was exited after &V1& steps. After these step...
KP287
Berechneter Tarif ist zu groß
Was verursacht dieses Problem? The price for &V1& calculated within price calculation is so high that it exceeds the field limits.Systemant...
Klicken Sie auf diesen Link, um alle SAP-Meldungen durchsuchen.